

SIDEBAR
commercial
Mary Isaak Center
Northern Electric Inc. was proud to be a part of the construction of the Mark Isaak Center, a 22,101 square foot facility that assists those in need of emergency shelter.
Northern Electric Inc. was proud to be a part of the construction of the Mark Isaak Center, a 22,101 square foot facility that assists those in need of emergency shelter.
Napa Creekside Plaza
Northern Electric Inc. provided and installed new site lighting and site power for Napa Creekside Plaza in Napa, CA.
Northern Electric Inc. provided and installed new site lighting and site power for Napa Creekside Plaza in Napa, CA.
ThermoFisher Scientific
Northern Electric Inc. and Devcon Construction teamed together on the ThermoFisher Scientific Project in Petaluma, CA.
Northern Electric Inc. and Devcon Construction teamed together on the ThermoFisher Scientific Project in Petaluma, CA.
Tenant Improvements for Calix
Working with Devcon Construction, NEI was the design-build electrical contractor for the Tenant Improvements in the existing Calix building in Petaluma CA.
Working with Devcon Construction, NEI was the design-build electrical contractor for the Tenant Improvements in the existing Calix building in Petaluma CA.
Sonoma County Sheriff’s Facility
This project consisted of construction of a 60,000 square foot 2-story building for the Sonoma County Sheriff’s Department.
This project consisted of construction of a 60,000 square foot 2-story building for the Sonoma County Sheriff’s Department.
Pickleweed Park and Community Center Remodel and Expansion
Northern Electric Inc. worked with Midstate Construction to renovate an existing community center and library. Part of the project included the addition of a new gymnasium and multi-purpose room.
Northern Electric Inc. worked with Midstate Construction to renovate an existing community center and library. Part of the project included the addition of a new gymnasium and multi-purpose room.
Ironworkers Apprenticeship Training Facility, Benicia CA
A 45,000 square foot build-out of administration, classroom and shop areas including underground electrical and telecommunications utilities.
A 45,000 square foot build-out of administration, classroom and shop areas including underground electrical and telecommunications utilities.
Pacific Gas and Electric Transmission Facility, Vacaville CA
In July of 2009, Northern Electric Inc. completed construction of a LEED Gold rated building for PG&E. NEI was responsible for the electrical, fire alarm, emergency generator, and UPS systems installation.
In July of 2009, Northern Electric Inc. completed construction of a LEED Gold rated building for PG&E. NEI was responsible for the electrical, fire alarm, emergency generator, and UPS systems installation.
Other Completed Office Buildings/Tenant Improvements/Commercial Projects
Visual Concepts
Hamilton Building #8
Santa Rosa Main Adult Detention Facility
Temple Beth Ami, Synagogue
Café Bella
Solano Juvenile Detention Facility
St. Anthony’s Buttery Barn
Redwood Business Center
Culinary Institute of America Remodel and Parking Lot
Homecoming Building Tenant Improvements
Hamilton Building # 6
Panamax
Tellabs ONT Labs
Amica
Tam Bank Phase II
Fountaingrove Lot 3
Spec. Space 1650
Laguna Waste Water Treatment Facility Laboratory
Fountaingrove Lot 7
Moss Adams Office Building


